Product

Acti 9 Smartlink

Energy digitization down to final switchboards.

Part of EcoStruxure

Acti 9 Smartlink Modbus slave and Acti 9 Smartlink Ethernet are used to transfer data from Acti 9 devices to a PLC or monitoring system via the communication system.

  • Presentations
  • Documents

Features


A unique innovation, to easily transfer data between a digital network and devices located in final switchboards :


  • status and alarms from protections.

  • remote controls to contactors.

  • metered values.

  • Optimize energy consumption, enable energy efficiency:-

  • Collect and analyze data from energy meters in each area, for each type of load or circuit.

  • Automate, schedule, and control operation of loads to optimize energy consumption.

  • Increase continuity of supply, power availability

  • Get immediate, precise warning in case of power loss.

  • Make evolution of your equipment quick and easy.

  • Allocate costs

  • Meter energy use, from large areas or sectors to individual loads.

  • ... and it’s never been easier to connect!

  • Direct connection to:

  • Modbus network (Acti 9 Smartlink Modbus).

  • Ethernet network (Acti 9 Smartlink Ethernet).

  • DIN rail fitting : No additional space needed.

  • 11 input / output channels.

  • All in one cables with pluggable connections.

  • IEC 61 131 Compliant (PLC I/O Modules).

Benefits


  • Smart in the way it centralizes control and collects energy meter data with just a simple ready-to-connect communication module.

  • Efficient in the way the one-click prefabricated wires communicate between distribution panels and any facility management system.

  • Safe and reliable in terms of control and metering connections.

Applications


  • Protection monitoring.

  • Load control switching.

  • Energy metering.