We Electro Care India focus here on the practical aspect of the installation process; physically bringing the system into your structure, installing it, and starting it up.
Once installed, the UPS system must be connected to the power distribution system. Most single Phase to three Phase UPSs have bottom cable entry for the input and output AC cables, and battery DC cables. This can be facilitated either by using a cable trench on the floor or mounting the UPS on a steel plinth sufficient to allow a satisfactory cable bend radius. If the UPS system is installed into a dedicated computer area, there may well be a raised floor to accommodate network, power cabling, and cooling. If so, the equipment and batteries should be mounted on adjustable steel stands, flush with the raised floor, to carry their weight.
- The scope involved installation and Commissioning of Single Phase UPS (Starts from 600VA Onward) and Three Phase UPS (Starts from 15KVA Onward).
- Battery Installation.
- Installation of DC Breaker.
- Cabling between UPS & Batteries.
- Testing of UPS.
- Commissioning of UPS.